Efficient Frac Sand Removal

Eliminate Workovers Due to “Sand Locking” Rod Pumps

Download Full Presentation: Eliminate Workovers Sand Locking

Problem: Located in the Mississippian Lime Formation, the operator could not produce the well for more than four to five days, due to leftover frac sand in wellbore.

Solution: Install JJ Tech Reverse Flow HSP Jet Pump to bring frac sand to surface along with production.

Results: Well remained on Jet Pump system 18 months, recovering 1-5 gallons of 20/40 mesh frac sand to surface daily until well cleaned out.

Advantages of Jet Pump vs. Rod Pump

• JJ Tech Jet Pump can produce moderate to high volumes of sand.
• Gas can be brought to the market immediately.
• No backpressure is put on formation (as with Nitrogen).
• Software can calculate PBHP based on production volumes.