Decreasing Well Costs

Decrease Operating Costs by Replacing ESP with Hydraulic Jet Pump

Download PDF Study: Decreasing Well Costs

Objective: To decrease operating costs by installing a JJ Tech Jet Pump. The operator replaced four ESP’s (Electric Submersible Pump) in a twelve month period.

Results: The well produced for nearly two and a half years without workover expenses.

Advantages of Jet Pump vs. Electric Submersible Pump:
• Jet Pump can produce moderate to high volumes of solids
• Jet Pump has no moving parts downhole
• Jet Pump can produce high volumes of oil
• Software can calculate PBHP based on production volumes

jjtech-jet-pump-decreasing-well-costs

 

Hydraulic Jet Pump Analysis

ESP #1 Case Study:

Download PDF Study: Decreasing Well Costs

Save