Solve complex well challenges with solutions from JJ Tech
Wells with Damanged Casings
With damaged casing, it’s difficult to produce fluids from a particular formation without comingled fluids from higher in the wellbore.
JJ Tech can design a system that can isolate a casing leak. We have jet pumps with small O.D. (1.66″) that can operate effectively inside of liners as small as 2.441″ (2-7/8″ production tubing).
Wells with a High GLR
No Downhole Moving Parts, No Gas Lock
The presence of free gas hinders the performance of many artificial lift solutions, reducing the liquid rates and the lifting ability. This decrease in performance, or “gas locking”, may be quite severe resulting in significant production losses, lower reliability, and increased operating costs due to premature equipment failure.
JJ Tech Jet Pumps can’t “gas lock” and typically perform better in higher GLR wells than positive displacement pumps, such as progressive cavity and reciprocating rod lifting pumps.
Deep Wells
Downhole Jet Pump Powered from the Surface
Some wells are too deep for traditional artificial lift methods. This can make some artificial lift technologies ineffective or impossible.
An artificial lift technology that combines our downhole solution, powered by a high horsepower diaphragm pump from the surface, JJ Tech Jet pumps can operate at depths up to 15,000 ft. TVD.
Wells With Changing Conditions
Optimize and Changeover Easily
Many artificial lift technologies require intervention when well conditions change. This intervention often requires expensive workover rigs to reconfigure downhole equipment to adapt to a change in well conditions.
Once installed, all JJ Tech Jet Pumps can be optimized from the surface by increasing or decreasing the amount of power fluid injected into the downhole jet pump. Using our jet pump optimization software, you can monitor downhole conditions to maximize the efficiency of our jet pump. If you need to change the downhole pump assembly, you can easily reverse-circulate our pump to the surface.
Also, you can set the data memory gauge and retrieve it hydraulically (without a workover rig) with the jet pump, enabling easy data capture.
TALK TO AN EXPERT
Our team of experts specialize in resolving your challenging oil and gas well production problems. Talk to JJ Tech about analyzing your well at no cost and let us show you how we can help optimize your well production and lower your operating costs.