Artificial Lift System for Liquid-Loaded Wells
Common in the later stages of a well’s lifecycle, particularly gas wells, liquid-loaded wells are characterized by an accumulation of water and hydrocarbon condensates. This accumulation of liquid forms a column in the well, creating backpressure that reduces or even halts the flow of gas to the surface.
JJ Tech’s hydraulic jet pump solution has proven to be very effective in liquid-loaded wells.
The Challenge
Gas wells commonly become “liquid-loaded” from water inside the gas-producing zone. This water creates a hydrostatic head that can reduce or cease gas production.
JJ Tech Jet Pump Solution
You can run JJ Tech jet pumps in a concentric string configuration where liquids are produced from below the perforations, lowering the hydrostatic column of fluid. Gas can then flow freely to the surface via the casing annulus.
Reduce Costs and Increase Oil and Gas Well Production
JJ Tech employs a combination of patented technologies to provide a tailored artificial lift solution designed to improve production and significantly lower overall operating costs over the life of your well.
SELECT-JET Pumps
Our unique design and manufacturing process results in best-in-class, efficient lift performance. Operators have the flexibility to place it in wells where other forms of artificial lift can’t operate.
Hydra-Cell Pro Diaphragm Pumps
The seal-less, packing-free design ensures a reliable, efficient way to power the JJ Tech jet pump.
Hydraulic Jet Pump Design & Optimization App
Using the actual surface and subsurface data from your oil or gas well, our Hydraulic Jet Pump Design & Optimization App lets you plot current jet pump performance and optimize for the future. Our app ensures the downhole jet pump is operating as efficiently as possible, thus maximizing overall production levels.
Jet Pump Advantages
Greater Reliability
With no moving parts, JJ Tech jet jumps produce wells with sand or solids with far less damage potential to the downhole pump. If, over time, jet pump parts do become worn, a workover rig is not needed for replacement.
Reduced Workover Costs
With a JJ Tech jet pump, three- to five-year run times between workovers is not uncommon. Our jet pump systems also allow for chemical treatment for tubing and casing on a continual basis.
Increased Production
A JJ Tech jet pump can also provide increased production when other forms of lift are unable to provide the desired drawdown on a producing formation.
TALK TO AN EXPERT
Our team of experts specialize in resolving your challenging oil and gas well production problems. Talk to JJ Tech about analyzing your well at no cost and let us show you how we can help optimize your well production and lower your operating costs.