Problem: Located in the Mississippian Lime Formation, the well could not produce for more than four to five days due to leftover frac sand in the wellbore.
Solution: The operator installed the JJ Tech Reverse Flow HSP Jet Pump to bring frac sand to the surface along with production.
Results: The well remained on the jet pump system 18 months, recovering 1-5 gallons of 20/40 mesh frac sand to the surface daily until the well cleaned out.
Advantages of Jet Pump vs. Rod Pump
• JJ Tech jet pumps can produce moderate to high volumes of sand.
• Gas can be brought to the market immediately.
• No backpressure is put on formation (as with nitrogen).
• Software can calculate PBHP based on production volumes.